200 Pinehurst Avenue, Manhattan
New Age Engineering PLLC designed a replacement heating plant for this building. This consisted of a scotch marine boiler and gas/oil burner, new chimney liner, and a domestic hot water heater for summer use. We have updated this building internet based controls to ensure energy savings to avoid excessive boiler runtimes.
Scope of Work
- Replacement low pressure steamboiler.
- Replacement dual fuel burner.
- New chimney liner for safenatural gas operation.
- New high pressure gas service.
- New separate hot water heater andstorage tank to operate in the summer months.
- Repairs to the existing fuelstorage tank.
Services Rendered
New Age Engineering performed afull building survey of the existing steam radiators and hot water fixtures toperform heating and hot water calculations to accurately size the boiler andhot water heater. Our firm provided the following services:
- Engineering Drawings and WrittenSpecifications.
- Pre-bid walkthrough, bid review,bid leveling and contract negotiation.
- NYC Department of Buildings (DOB)& Department of Environmental Protection (DEP) expediting services.
- Project administration, paymentrequisitions and oversight.
- Special & Progressinspections.
- Final Punchlist and close out documentation.